A third expansion of our production floor. This new 18,000 sq. ft. space has become necessary to allow for the addition of a second perfect binder, as well as three additional loading docks and an employee room. Located at the rear of the main building, this new area is built on stilts due to the slope towards the St. Maurice River. The new building code required a fireproof insulation to separate this expansion from the rest of the factory. Until the arrival of the perfect binder, we are taking advantage of the space to set up an inserter and additional space for work-in-progress and assembly.